| Price |
Free
|
$
450
USD
|
$
950
USD
|
$
3,500
USD
|
| Maximum Number of Fault Tree Items |
30 |
100 |
300 |
Unlimited |
| Classical Minimal Cut Sets Method |
|
|
|
|
| Binary Decision Diagram Method |
|
|
|
|
| Fault Tree Evaluation |
| Minimal Cut Sets |
|
|
|
|
| Unavailability |
|
|
|
|
| Availability |
|
|
|
|
| Reliability |
|
|
|
|
| Unreliability |
|
|
|
|
| Unconditional Failure Intensity |
|
|
|
|
| Conditional Failure Intensity |
|
|
|
|
| Expected Number of Failures |
|
|
|
|
| Total Down Time |
|
|
|
|
| Average Unavailability |
|
|
|
|
| Average Unconditional Failure Intensity |
|
|
|
|
| Average Conditional Failure Intensity |
|
|
|
|
| Probability of Failure on Demand (PFD) |
|
|
|
|
| Average Probability of Failure on Demand (PFD Avg) |
|
|
|
|
| Probability of Failure per Hour (PFH) |
|
|
|
|
| Average Probability of Failure per Hour (PFH Avg) |
|
|
|
|
| Marginal Importance Factor (Birnbaum Importance) |
|
|
|
|
| Critical Importance Factor (Fussell-Vesely Importance) |
|
|
|
|
| Risk Achievement Worth |
|
|
|
|
| Risk Reduction Worth |
|
|
|
|
| Diagnostic Importance Factor |
|
|
|
|